Port Authority EWR Redevelopment has initiated the replacement of the existing AirTrain system at Newark Liberty International Airport. The EWR Redevelopment AirTrain Newark Replacement Program will replace the current outmoded system with a modern, reliable 2.5 mile auto mated people…

In partnership with Oxford ATS, JGM provides services for 12 Passenger Boarding Bridges (PBBs) and operates baggage handling for all of Terminal B at EWR Airport. We provide 17 jet bridge operators and 11 baggage handling system technicians. Our staff…

A milestone project for LAX, the connector allows for all terminals to be connected and walkable after security checkpoints. It includes a passenger security screening checkpoint, a checked baggage inspection system, and vertical circulation atria. JGM’s role was to work…

The project proposes the construction of a new five-level, 417,575 square-foot building located between Terminals 1 and 2. The new facility will ease congestion and provide connectivity between the two terminals – both within the ticketing and check-in portion as…

The design and construction of a 15,000-square foot building to house baggage screening facilities for Terminal 5 at LAX was awarded to Siemens Industry, Inc who partnered with JGM. JGM took on developing 30% of the bridging documents for this…

The Remote Boarding Facilities designed by JGM at Los Angeles International Airport (LAX) address the need for improved security for visiting heads of state and Air force One, and the need for accommodating passenger overflow at the Tom Bradley International…

Traffic into and on the roadways in the LAX Central Terminal Area is a significant concern, with an estimated 50 percent of air travelers driving to and from the airport by car. The number of vehicles is expected to increase…

JGM is proud to have been a valued member of the design and construction administration teams partnering with ARUP and Gensler for the Delta 2023 modernization and upgrade of Terminal 2 and new construction of Terminal 3 (T3), which directly…

JGM provided construction management and project control services for a major rehaul and replacement of LAX’s Central Utility Plant (CUP). Major components included installing chillers, generators, cooling towers, thermal energy storage tank and system, among other complex systems. JGM helped…

Completed fall of 2021, the Airport Police Facility (APF) at the Los Angeles International Airport is one of the most extensive police facilities in California. The 160,000-square-foot building improved the coordination of resources for essential public safety services by consolidating…

JGM was sought out by Oxford ATS to provide services for baggage handling at both Terminal B at LaGuardia Airport (LGA) and at Newark Liberty International Airport (EWR). Our staff is performing technical services, delivery services, general services, and inventory…

Baggage Handling System Design Indianapolis International Airport (IND) made improvements of $1 billion across the operation. A major focus was nearly doubling the size of its Midfield Terminal, building a new air traffic control tower, and constructing a new highway…

At Los Angeles International Airport (LAX), JGM played a key part in developing a Security Program In-Line Baggage Screening Systems.

Ontario International Airport (ONT), one of the fastest growing airports in the country, is expected to play a significant role for the economic development of the Inland Empire.

For more than 15 years, JGM has been providing Aviation Planning and Architectural services for Los Angeles World Airports.

In response to the September 11th events, facility operations at Los Angeles International Airport (LAX) developed a two-phase process to satisfy current and future Federal security requirements.