LAX Delta Modernization Program

  • Scope: Planning, Design, Building Information Modeling (BIM), Construction Management
  • Location: Los Angeles, CA
  • Client: Los Angeles World Airport (LAWA)
  • Budget: $2.4 Billion
  • Timeline: 2017-2023

JGM is proud to have been a valued member of the design and construction administration teams partnering with ARUP and Gensler for the Delta 2023 modernization and upgrade of Terminal 2 and new construction of Terminal 3 (T3), which directly connects the T3-West Headhouse to the Tom Bradley International Terminal. The new T3-West Headhouse features a centralized lobby and secure screening checkpoints, enabling seamless connections between international and domestic transfers for passengers and their baggage. In addition, connectivity preparations have been made to allow Los Angeles World Airport’s (LAWA) future (and currently under construction) Automated People Mover (APM) system to seamlessly connect to T3 at two points along the East and West Headhouse APM cores, situated at either end of the terminal. This project demonstrated our design team’s adaptability to a tenant’s aesthetic requests while meeting the strict requirements of LAWA and the Los Angeles Department of Building and Safety (LADBS).

T3 was completed ahead of schedule and under budget, due to an accelerated project schedule adopted during 2020 when air traffic was significantly decreased—all Delta LAX operations could function out of T2, resulting in T3’s completion one year earlier and saving nearly $58 million.