Sempra Pipeline Safety Enhancement Program (PSEP) Phase 1A

  • Scope: Design, Engineering, Surveying, CM, Materials Testing & Inspection
  • Location: Southern California
  • Client: Sempra Utilities
  • Budget: $1.63 Billion
  • Timeline: 2023

On June 16, 2011, in decision 0.11-06-017, the CPUC ordered all California natural gas transmission operators to develop and file an Implementation Plan to replace or pressure test all pipelines not tested to modern standards. The decision also required operators to include a plan for automating shut-off valves in the Implementation Plan.

The plan was split into two phases: a 10-year Phase 1 and a to-be-determined Phase 2. Phase 1 was split into Phase 1A, years 1 through 4, and Phase 1B, years 5 through 10. The scope for Phase 1A is to pressure test or replace the priority transmission lines in populated areas and to automate priority valves. The estimated direct capital costs for Phase 1A are approximately $1.2 billion for SoCalGas and $229 million for SDG&E, and the estimated direct O&M costs for Phase 1A are approximately $225 million for SoCalGas and $7 million for SOG&E.